Not Logged In

Publications by Miyano, Eiji

In Journal (refereed)

1. W. Tong, E. Miyano, R. Goebel, G. Lin. "An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops". Theoretical Computer Science, 734, pp 24-31, July 2018. PDFview

In Workshop

2. W. Tong, E. Miyano, R. Goebel, G. Lin. "A PTAS for the Multiple Parallel Identical Multi-stage Flow-Shops to Minimize the Makespan". International Frontiers of Algorithmics Workshop, pp 227-237, June 2016. PDFview
University of Alberta Logo AICML Logo